Elevator installation project

New buildings · Homes · Replacements

Elevator Installation in Pune

Everything between choosing a lift and putting it into service — survey, civil readiness, installation, testing and handover.

  1. 01Site survey
  2. 02Drawings & civil readiness
  3. 03Material delivery
  4. 04Installation
  5. 05Testing & commissioning
  6. 06Handover

What does elevator installation involve?

Elevator installation covers everything between choosing a lift and putting it into service: surveying the site, confirming the shaft and power are ready, installing guide rails, machine, car and doors, wiring the controller, then testing, commissioning and handing over with documentation. GEVS plans each stage with the building owner and contractor in Pune.

Before you start: read the shaft, pit and overhead requirements and single-phase vs three-phase power guides.

Elevator installation site overview

03 · At a glance

Elevator installation at a glance

Service
Lift supply and installation
For
Homes, housing societies, commercial and institutional buildings
Starts with
A site survey of shaft, pit, overhead and power
Based in
Pimpri Chinchwad, Pune

05 · Problems we help with

Fewer surprises between drawing and handover

  1. Elevator shaft installation detail
    Problem
    “We don't know if our shaft is the right size”
    What we do
    Survey and measure the shaft, pit and overhead against the chosen lift
    Intended outcome
    Civil work is checked before equipment arrives
  2. Elevator installation planning detail
    Problem
    “Our contractor needs exact civil requirements”
    What we do
    Share a lift drawing with openings, pit, overhead and power points
    Intended outcome
    Fewer surprises and rework on site
  3. Elevator installation equipment on site
    Problem
    “We need the lift ready by possession”
    What we do
    Agree a sequence of works tied to shaft readiness
    Intended outcome
    A schedule you can plan the building handover around

Shaft half-built or still on drawings?

A site assessment tells you exactly what to prepare next — before the civil work goes further.

06 · Scope

What's included and what's not

Included

  • Site survey and lift drawing
  • Delivery of lift equipment to site
  • Installation of rails, machine, car, counterweight and doors
  • Controller, COP and LOP wiring
  • Testing of safety circuits, interlocks, levelling and ARD
  • Handover walkthrough and documentation

Not included

  • –Shaft, pit and machine-room civil construction
  • –Main power supply up to the lift isolator
  • –Shaft lighting and finishing around landing doors
  • –Statutory fees
Elevator installation work and deliverables

What you receive

  • Lift drawing for the civil contractor
  • Test and commissioning record
  • User handover and emergency-feature walkthrough

Typical scope for this service. Your exact inclusions and exclusions are written into the quotation before you sign.

Need this scope written for your building?

We survey first, then set out inclusions and exclusions in the quotation.

07 · How it works

The installation, stage by stage

  1. 1
    Elevator installation planning stage

    Site survey

    Measure the shaft, pit and overhead; check the structure and power supply; agree the lift configuration.

  2. 2
    Elevator shaft preparation stage

    Drawings & civil readiness

    We share the lift drawing so your contractor prepares the shaft, pit, openings and electrical points.

  3. 3
    Elevator rail installation stage

    Material delivery

    Rails, machine, controller, car and door equipment arrive once the shaft is ready.

  4. 4
    Elevator cabin installation stage

    Installation

    Guide rails, machine, car, counterweight, doors, panels and wiring are installed.

  5. 5
    Elevator electrical installation stage

    Testing & commissioning

    Safety circuits, door interlocks, levelling, ARD and emergency features are tested before use.

  6. 6
    Elevator installation handover stage

    Handover

    A user walkthrough, documentation and the start of the maintenance plan.

08 · Before installation

What the building prepares

Installation runs smoothly when the civil and electrical works are ready. These are prepared by the building, to our drawing.

  • Building readiness for elevator installation
    01

    Shaft built to the drawing

    Width, depth and plumb as specified, with the pit depth and overhead height the selected lift needs.

  • Elevator shaft readiness check
    02

    Power and earthing

    A dedicated supply with earthing brought to the agreed location, ready before testing begins.

  • Elevator power readiness check
    03

    Landing openings and floor levels

    Door openings formed at every landing and finished floor levels marked, so doors and sills line up.

  • Elevator landing readiness check
    04

    Access and storage

    Safe access to the shaft and a secure, dry space to store rails, machine and doors during installation.

Have drawings already?

Share them and we'll check the shaft, pit and openings against the lift you need.

Shaft half-built or still on paper? A site assessment tells you what to prepare next.

Request Site Assessment

09 · Civil & electrical

Shaft, pit, overhead and power

Elevator shaft and pit requirements

Shaft, pit and overhead

Every lift needs a vertical shaft, a pit below the lowest floor and clear headroom above the top stop. Their sizes follow the car size, door arrangement and drive, so we confirm them against your drawings at the survey.

Read: shaft, pit and overhead requirements
Elevator electrical power requirements

Single-phase or three-phase power?

Most lifts in multi-storey buildings need a dedicated three-phase supply with earthing; some home lifts run on single-phase. We tell you early, so your electrician can prepare the supply before testing.

Read: single-phase vs three-phase power

11 · Testing & commissioning

Safety checks before handover

  1. Elevator door safety check

    Door interlocks

    The lift must not move unless every car and landing door is closed and locked.

  2. Elevator control safety check

    Safety circuits and limits

    Safety circuits and limit switches are checked so the car stops if anything is out of place.

  3. Elevator cabin safety check

    Levelling

    The car is set to stop level with each floor so nobody trips on the sill.

  4. Elevator emergency system check

    Rescue on power failure

    Where an Automatic Rescue Device (ARD) is fitted, it is tested to bring the car to a floor and open the doors.

  5. Elevator operation safety check

    Emergency features

    Alarm, emergency light and communication in the car are checked before handover.

Elevator safety inspection on site

The control panel, ARD, COP and LOP used by GEVS are declared IS 17900-compatible by our component supplier, Inditech.

How our safety and control systems work

Planning around a possession date?

Book the site assessment now and get a schedule with your quotation.

12 · Approvals

Approvals and handover documents

Lifts in Maharashtra are subject to licensing and inspection. The broad sequence is below; the scope of any paperwork support from GEVS is agreed in the quotation.

  1. 1

    Lift specified and drawings prepared

  2. 2

    Installation completed and tested

  3. 3

    Inspection and licensing as required by the state's lift rules

  4. 4

    Lift handed over for use

Documents typically handed over

  • Commissioning and test record
  • User instructions for daily use and emergencies
  • Lift drawing for your records
  • Start of the maintenance plan

The exact list for your project is set out in the quotation.

Elevator approval and handover documents

13 · Schedule

What affects how long installation takes

We give a schedule with the quotation once the survey is complete — not a generic figure.

Elevator installation project timeline
  • Shaft readiness

    Equipment can only be installed once the shaft matches the drawing

  • Number of floors

    Each landing adds a door, panel and wiring to fit and test

  • Lift type

    Larger or more complex installations take longer to erect and commission

  • Site access

    Restricted access or occupied buildings need careful sequencing

  • Power availability

    Testing and commissioning need the permanent supply in place

14 · Budget

What affects the cost of elevator installation?

Factors that affect cost
FactorEffect on cost
Lift type and capacityLarger cars and higher loads need bigger machines and heavier rails
Number of stopsEach stop adds a landing door, call panel and wiring
Shaft readinessDelays or corrections to civil work extend time on site
Door and cabin finishAutomatic doors and premium cabin finishes add cost
Site accessRestricted access or occupied buildings need more careful sequencing

We don't publish generic prices: a written quotation follows the site survey. See elevator cost factors.

Want a figure for your building, not a generic one?

Quotations follow the survey, so they reflect your floors, shaft and lift type.

Preparing for an elevator site assessment

16 · Before you call

Have these ready and the site assessment goes faster

Preparation checklist

17 · Why GEVS

What you can verify about us

  • Inclusions and exclusions set out in writing before you sign
  • One team for installation, maintenance, repair and modernisation
  • A local team based in Pimpri Chinchwad, Pune
  • Documented safety components — see our safety & control systems
  • GST-registered business since March 2021

    Source: GST REG-06

  • Registered place of business in Pimpri Chinchwad, Pune

    Source: GST REG-06

  • The control panel, ARD, COP and LOP used by GEVS are declared IS 17900-compatible by our component supplier, Inditech.

    Source: Inditech component declaration

  • Full company facts on About GEVS.

FAQs

Frequently asked questions

Answers to the questions we hear most about installing a lift.

How long does an elevator installation take?

Duration depends on the lift type, the number of floors and whether the shaft is ready when equipment arrives. Because civil readiness varies so much from site to site, we give a schedule with the quotation once the survey is complete, rather than a generic figure.

Who builds the lift shaft?

The shaft and pit are civil work, usually done by your builder or contractor to the lift drawing we provide. We inspect the shaft before installation starts and flag anything that does not match the drawing, so corrections happen before equipment is fitted.

Shaft, pit and overhead requirements →

What power supply does a new lift need?

Most lifts in multi-storey buildings need a dedicated three-phase supply with proper earthing, while some home lifts run on single-phase. We confirm the requirement for your lift during the survey so your electrician can prepare the supply, isolator and earthing in time for testing.

Single-phase vs three-phase power →

Can a lift be installed while the building is occupied?

Yes, with careful planning. Work areas are barricaded, materials are stored safely, noisy work is scheduled around residents or staff, and landing openings are protected until the doors are fitted. We agree the sequence of works and access arrangements with the building before installation starts.

What documents do we receive at handover?

Typically a record of the tests carried out during commissioning, user instructions covering daily use and emergency features, and the lift drawing for your records. The exact handover documents for your project are listed in the quotation, so you know before work begins what you will receive.

What should be ready before the installation team arrives?

The shaft and pit should be built to the lift drawing, landing openings marked at finished floor levels, a dedicated power supply with earthing brought to the agreed point, and safe access and storage space provided. We inspect these first and flag anything that needs correcting.

Do we need approvals before using a new lift in Maharashtra?

Lifts in Maharashtra are subject to licensing and inspection under the state's lift rules, so a new lift should not be put into public use until the required steps are complete. We explain the process during the project; the scope of any paperwork support is agreed in the quotation.

Next step

Request a site assessment.

Tell us the building, number of floors and how far the shaft has progressed. We'll survey and tell you exactly what to prepare.

Written by the GEVS team · Last reviewed: · GEVS – Gauri Enterprises Vertical Solutions, based in Pimpri Chinchwad, Pune