Shaft, pit and overhead requirements explained

6 min read · GEVS engineering team

Looking up an elevator shaft

The short answer

Every lift needs three spaces: the shaft (the vertical enclosure the car travels in), the pit (a recess below the lowest floor) and the overhead (clear height above the top floor). Their dimensions depend on the lift's capacity, speed, door type and drive, and must be confirmed against the chosen lift before construction.

The three spaces

SpaceWhat it isWhy it is needed
ShaftVertical enclosure for the car and counterweightHolds guide rails, car, counterweight and landing doors
PitRecess below the lowest landingRoom for buffers and safe clearance below the car
OverheadClear height above the top landingSafe clearance above the car at the top stop; machine space in MRL

What decides the dimensions

  • Car size (capacity)
  • Door type and opening width
  • Counterweight position
  • Rated speed
  • Drive type (MRL or machine room)

Exact values come from the lift supplier's drawing for the selected lift. Do not build a shaft from generic numbers.

Key takeaways

  • Shaft, pit and overhead are all required
  • Size depends on the selected lift
  • Get the lift drawing before construction