Shaft, pit and overhead
Removing the machine room does not remove pit and overhead requirements. The shaft must still provide the pit depth and top clearance the selected lift needs.
Read: shaft, pit and overhead requirementsArchitects · Builders · MEP Consultants
Traction lifts with a compact machine inside the shaft, so the building needs no separate machine room on the roof.
Machine-room-less planning for suitable buildings

Illustrative photography


Technology focus
Machine-room-less configuration
Residential buildings
Apartment towers
Office buildings
Mixed-use buildings
Hotels
Institutional buildings
New-build projects


Quick answer
A machine room-less (MRL) elevator places its compact machine inside the shaft instead of in a separate room above it. That frees roof space and simplifies construction, which is why MRL lifts are widely used in low- and mid-rise residential and commercial buildings. Pit and overhead space must still meet the lift's requirements.

Equipment location

Shaft & clearances

Service access
Who it's for
01No roof machine room to design and build
02The machine sits in the shaft
03Compact layout for typical heights


Selection
MRL suitability depends on the building height, traffic, shaft dimensions, pit and overhead, drive configuration and maintenance access. These details should be confirmed during technical assessment.
01Floor count, travel and traffic help establish the suitable lift configuration.
02Measured dimensions determine whether the proposed MRL arrangement can fit.
03Equipment location, safe access and maintenance clearances need engineering review.
04Expected use informs capacity, speed and the number of lifts required.
How it works
An MRL lift is a traction lift: ropes or belts run over a sheave turned by a compact machine, balanced by a counterweight. The difference is location — the machine is mounted inside the shaft, typically at the top, and the controller sits in a slim panel near the top landing.
The control system GEVS uses is the Inditech MRL200 panel with an integrated ARD — a slim 300 × 1600 × 210 mm panel with an integrated drive and control card, direct landing and unintended car movement protection (UCMP), as listed in the supplier's documentation.


Features
Specification
Configured per building, then written into the quotation.
| Parameter | Value |
|---|---|
| Elevator Type | Machine Room-Less (MRL) Passenger Elevator |
| Drive System | Electric traction drive |
| Machine Type | Gearless traction machine, depending on model |
| Controller | Microprocessor-based control system |
| Rated Load Capacity | Typically 320–1600 kg, depending on model |
| Passenger Capacity | Approximately 4–21 persons, depending on rated load |
| Rated Speed | Typically 0.5–2.5 m/s, depending on application |
| Number of Stops | As per building requirements and approved design |
| Travel Height | As per building configuration |
| Door Type | Automatic sliding doors |
| Door Configuration | Centre-opening or side-opening, depending on model |
| Cabin Design | Stainless steel, decorative laminates, glass or other selected finishes |
| Operation | Automatic, with collective or other configured control |
| Safety Features | Door interlocks, overspeed governor, safety gear and overload protection, as applicable |
| Emergency Rescue | Automatic Rescue Device (ARD), where provided |
| Power Supply | Three-phase supply; voltage and frequency as per selected equipment |
| Installation | Designed for installation without a separate machine room |
| Shaft Requirements | As per rated capacity, speed, layout and manufacturer drawings |
| Pit and Overhead | As per the approved elevator layout |
| Standards | Applicable Indian elevator safety standards and local statutory requirements |
Civil & electrical

Removing the machine room does not remove pit and overhead requirements. The shaft must still provide the pit depth and top clearance the selected lift needs.
Read: shaft, pit and overhead requirements
MRL passenger lifts in multi-storey buildings typically run on a three-phase supply; we confirm requirements per project.
Read: single-phase vs three-phase powerPlanning a new building? Confirm MRL feasibility, shaft dimensions and equipment access with a technical assessment.
Request Technical SpecificationsApplications
Inspiration
Illustrative photography only; confirm the proposed configuration and finishes for each project.
Honest trade-offs
Process
| Factor | Effect on cost |
|---|---|
| Number of stops and travel height | More floors means longer rails, more landing doors and more wiring |
| Load and cabin size | A larger car needs a bigger machine, stronger structure and wider shaft |
| Drive and machine location | MRL, machine-room traction and other drives differ in equipment and civil cost |
| Door type | Automatic doors cost more than manual doors; wider openings add cost |
| Cabin finish | Stainless steel, glass, wood and gold finishes are priced differently |
| Civil and electrical work | Shaft construction, pit, overhead and the power connection are often separate costs |
We don't publish generic prices: a written quotation follows the site survey. See elevator cost factors.
Safety
The control panel, ARD, COP and LOP used by GEVS are declared IS 17900-compatible by our component supplier, Inditech.
How our safety and control systems work
Because the machine is in the shaft, technicians work from the car top and the landing. Scheduled maintenance covers the machine, brake, ropes, controller and ARD battery.
Learn about elevator AMC plansDocuments
PDF, 32 MB · sent on request
FAQs
MRL is a good fit for most low- and mid-rise buildings because it needs no roof machine room. Very tall or high-speed installations may favour a machine room. We compare both options for your building during the consultation and explain the trade-offs in writing.
MRL vs traction elevators compared →The machine is mounted inside the shaft, usually at the top, and the controller sits in a slim panel near the top landing. Technicians reach the machine from the car top and the controller from the landing, so no separate machine room is needed.
Next step
Share the building type, number of floors, shaft status and available pit and overhead details. GEVS can review the project requirements and confirm the technical information needed for a quotation.