In short
For a builder, lifts are a scheduled package within the project: they must be specified early so shafts are built correctly, installed in sequence with civil and finishing work, and handed over with documents and a maintenance plan the society can take on.
The challenge
What this building type deals with
Common problems
- Shaft dimensions fixed before lifts are finalised
- Coordinating installation with civil progress
- Consistent specifications across towers
- Handover to the society
What the lifts need
- Early technical drawings
- Predictable installation sequence
- Documented commissioning
- Handover AMC
Planning checklist
Before you decide
- 01Freeze lift capacity, speed and door type before shaft construction
- 02Share structural drawings for shaft, pit and overhead checks
- 03Agree power points and machine/controller locations
- 04Plan delivery and installation against the civil schedule
- 05Agree the handover documents and AMC start
Recommended
Solutions for this building type
FAQs
Common questions
When should we involve a lift company in a project?
As early as the structural design stage, so shaft, pit and overhead dimensions match the lift you will install.
Next step
Talk to a GEVS specialist.
Tell us about your building and what you need. We'll recommend the right lift, service or upgrade and arrange a site consultation.